Introduction
In this tutorial, you will learn how to move or dispose of two racks.
Prerequisites
Sample Processing role is required to access this workflow.
Workflow
Job Creation
Create a new job and select the Move & Dispose Rack workflow.
Requesting
- Specify Request from Text.
- Copy and paste the rack names in the text area: RDNG0001:RDNG0002 (rack names can be separated by colons or line breaks).
- Click
Add IDsto confirm. The racks are listed in the added requests. - Click
Next.
Sourcing
The Sourcing page will confirm that the requested operations are compatible with the source racks (see the Sourced column).
- Click
Next.
Storing
The Storing step allows you to assign a location to the items involved in the job.
- Click
Assign Location to Selectedto move the rack location. - Select Paris > HTS Lab > Freezer 1 and click
Selectto confirm your choice. If you want to dispose the racks, select theGarbagelocation instead. - Click
Next.
A message box asks if you want to increment the Thawing Cycle of the racks. Click No to continue.
Pipe & Close
The Pipe & Close step provides a summary page where you can review the job and optionally pipe it to another workflow.
For this tutorial, click Close & Quit to finish the job.

